|  |
 |
Table of contents:
|  | HTML |  | PDF |
This article:
|  | HTML |  | PDF |
| Copyright info |  |
 |
 |
Reducing planned outages for book hardware maintenance with concurrent book replacement - References
|  |  |
by C. R. Conklin, C. J. Hollenback, C. Mayer, and A. Winter |
 |  |  |
|
-
P. S. Weygant, Clusters for High Availability: A Primer of HP Solutions, Prentice Hall, Upper Saddle River, NJ, 2001.
-
M. R. Barber, “Increased Server Availability and Flexibility Through Failover Capability,” Proceedings of the Eleventh Systems Administration Conference (LISA '97), San Diego, CA, 1997, pp. 89–98.
-
M. Mueller, L. C. Alves, W. Fischer, M. L. Fair, and I. Modi, “RAS Strategy for IBM S/390* G5 and G6,” IBM J. Res. & Dev. 43, No. 5/6, 875–888 (1999).
-
M. L. Fair, C. R. Conklin, S. B. Swaney, P. J. Meaney, W. J. Clarke, L. C. Alves, I. N. Modi, F. Freier, W. Fischer, and N. E. Weber, “Reliability, Availability, and Serviceability (RAS) of the IBM eServer z990,” IBM J. Res. & Dev. 48, No. 3/4, 519–534 (2004).
-
U. Helmich, M. Becht, M. J. Becht, J. R. Easton, R. K. Errickson, T. Gehrmann, S. G. Glassen, S. R. Greenspan, F. Koeble, H. Lehmann, C. Mayer, J. S. Nikfarjam, F. A. Schumacher, and W. Storz, “Redundant I/O Interconnect,” IBM J. Res. & Dev. 51, No. 1/2, 173–184 (2007, this issue).
-
K. Theurich, A. Albus, F. Eickhoff, D. Immel, A. Koehler, E. Lange, and J. von Buttlar, “Advanced Firmware Verification Using a Code Simulator for the IBM System z9,” IBM J. Res. & Dev. 51, No. 1/2, 207–216 (2007, this issue).
*Trademark, service mark, or registered trademark of International Business Machines Corporation in the United States, other countries, or both.
|
|
|