IBMSkip to main content
  Home     Products & services     Support & downloads     My account  
  Select a country 
Journals Home 
 Systems Journal 
Journal of Research
and Development
 ·  Current Issue 
 ·  Recent Issues 
 ·  Papers in Progress 
 ·  Search/Index 
 ·  Orders 
 ·  Description 
 ·  Patents 
 ·  Recent publications 
 ·  Author's Guide 
 Staff 
 Contact Us 
 Related links: 
    IBM China
   Research Laboratory
 
    IBM India
   Research Laboratory
 
    IBM Tokyo
   Research Laboratory
 
IBM Journal of Research and Development 
Volume 48, Number 5/6, 2004
IBM Research in Asia
 Table of contents: arrowHTML arrowPDF   This article: arrowHTML arrowPDF arrowCopyright info
  

Finishing Line Scheduling in the steel industry - References

by H. Okano, A. J. Davenport, M. Trumbo, C. Reddy, K. Yoda, and M. Amano

References

  1. H. Yasuda, H. Tokuyama, K. Tarui, Y. Tanimoto, and M. Nagano, “Two-Stage Algorithm for Production Scheduling of Hot Strip Mill,” Oper. Res. 32, 695–707 (1984).
  2. H.-L. Fang and C.-H. Tsai, “A Genetic Algorithm Approach to Hot Strip Mill Rolling Scheduling Problems,” Proceedings of the International Conference on Tools with Artificial Intelligence, IEEE, Piscataway, NJ, 1998, pp. 264–271.
  3. L. Lopez, M. W. Carter, and M. Gendreau, “The Hot Strip Mill Production Scheduling Problem: A Tabu Search Approach,” Eur. J. Oper. Res. 106, 317–335 (1998).
  4. M. Numao and S. Morishita, “Co-operative Scheduling and Its Application to Steelmaking Industries,” IEEE Trans. Indust. Electron. 38, 150–155 (1991).
  5. H.-S. Lee, S. S. Murthy, S. W. Haider, and D. V. Morse, “Primary Production Scheduling at Steelmaking Industries,” IBM J. Res. & Dev. 40, 231–252 (1996).
  6. S. N. Talukdar, L. Baerentzen, A. Gove, and P. S. de Souza, “Asynchronous Teams: Cooperation Schemes for Autonomous Agents,” J. Heuristics 4, 295–321 (1998).
  7. S. N. Talukdar, P. S. de Souza, and S. Murthy, “Organizations for Computer-Based Agents,” Int. J. Eng. Intell. Syst. 1, 75–87 (1993).
  8. H. Gao, J. Zeng, and G. Sun, “Multi-Agent Approach for Planning and Scheduling of Integrated Steel Processes,” Proceedings of the IEEE International Conference on Systems, Man, and Cybernetics, 2002, pp. 427–432.
  9. L. M. Wein and P. B. Chevalier, “A Broader View of the Job-Shop Scheduling Problem,” Manage. Sci. 38, 1018–1033 (1992).
  10. R. C. Leachman, J. Kang, and V. Lin, “Slim: Short Cycle Time and Low Inventory in Manufacturing at SamsungElectronics,” Interfaces 32, 61–77 (2002).
  11. J. L. Bentley, “Fast Algorithms for Geometric Traveling Salesman Problems,” ORSA J. Computing 4, 387–411 (1992).
  12. D. S. Johnson and L. A. McGeoch, “The Traveling Salesman Problem: A Case Study,” Local Search in Combinatorial Optimization, E. H. L. Aarts and J. K. Lenstra, Eds., John Wiley and Sons, Inc., New York, 1997, pp. 215–310.
  13. H. Okano, T. Morioka, and K. Yoda, “A Heuristic Solution for the Continuous Galvanizing Line Scheduling Problem in a Steel Mill,” Research Report RT-0478, 2002; IBM Tokyo Research Laboratory, 1623-14 Shimo-tsuruma, Yamato-shi, Kanagawa-ken 242-8502, Japan.
  14. J. L. Bentley, “K-d Trees for Semidynamic Point Sets,” Proceedings of the Sixth Annual ACM Symposium on Computational Geometry, 1990, pp. 187–197.
  15. G. A. P. Kindervater and M. W. Savelsbergh, “Vehicle Routing: Handling Edge Exchanges,” Local Search in Combinatorial Optimization, E. H. L. Aarts and J. K. Lenstra, Eds., John Wiley and Sons, Inc., New York, 1997, pp. 337–360.