|
|
 | |  |
Volume 48, Number 3/4, 2004
IBM eServer z990 |
|
Table of contents:
HTML PDF | |
This article:
HTML PDF | Copyright info |
 |  |  |  |
| | |
IBM eServer z990 improvements in firmware simulation - References
|
 |
by
M. Stetter, J. von Buttlar, P. T. Chan, D. Decker, H. Elfering, P. M. Gioquindo, T. Hess, S. Koerner, A. Kohler, H. Lindner, K. Petri, and M. Zee
|
 |  |
 |
References
-
S. Koerner, M. Kuenzel, and E. C. McCain, “IBM eServer z900 System Microcode Verification by Simulation: The Virtual Power-On Process,” IBM J. Res. & Dev. 46, No. 4/5, 587–595 (July/September 2002).
-
J. Kayser, S. Koerner, and K.-D. Schubert, “Hyper-Acceleration and HW/SW Co-Verification as an Essential Part of IBM eServer z900 Verification,” IBM J. Res. & Dev. 46, No. 4/5, 597–605 (July/September 2002).
-
J. von Buttlar, H. Böhm, R. Ernst, A. Horsch, A. Kohler, H. Schein, M. Stetter, and K. Theurich, “z/CECSIM: An Efficient and Comprehensive Microcode Simulator for the IBM eServer z900,” IBM J. Res. & Dev. 46, No. 4/5, 607–615 (July/September 2002).
-
IBM Corporation, IBM 370-XA Interpretive Execution (SA22-7095); see http://www.elink.ibmlink.ibm.com/public/applications/publications/cgibin/pbi.cgi/.
-
B. White, J. Nesbit, and I. Neville, “IBM eServer zSeries Connectivity Handbook,” IBM Redbooks (SG24-5444); see http://www.redbooks.ibm.com/pdfs/sg245444.pdf, pp. 133-141 (2003).
-
B. White, R. Ayvar, and V. Uskokovic, “zSeries HiperSockets,” IBM Redbooks (SG24-6816); see http://www.redbooks.ibm.com/redbooks/pdfs/sg246816.pdf (2002).
-
L. W. Wyman, H. M. Yudenfriend, J. S. Trotter, and K. J. Oakes, “Multiple Logical Channel Subsystems: Increasing zSeries I/O Scalability and Connectivity,” IBM J. Res. & Dev. 48, No. 3/4, 489–505 (May/July 2004, this issue).
-
S. Koerner, R. Bawidamann, W. Fischer, U. Helmich, D. Klodt, B. K. Tolan, and P. Wojciak, “The z990 First Error Data Capture Concept,” IBM J. Res. & Dev. 48, No. 3/4, 557–567 (May/July 2004, this issue).
-
B. White, V. Braga, and J. van Dellen, “OSA-Express Implementation Guide,” IBM Redbooks (SG24-5948-02); see http://www.redbooks.ibm.com/redbooks/pdfs/sg245948.pdf (2003).
-
D. J. Stigliani, T. E. Bubb, D. F. Casper, J. H. Chin, S. G. Glassen, J. M. Hoke, V. A. Minassian, J. H. Quick, and C. H. Whitehead, “IBM eServer z900 I/O Subsystem,” IBM J. Res. & Dev. 46, No. 4/5, 421–445 (July/September 2002).
-
F. Baitinger, H. Elfering, G. Kreissig, D. Metz, J. Saalmueller, and F. Scholz, “System Control Structure of the IBM eServer z900,” IBM J. Res. & Dev. 46, No. 4/5, 523–535 (July/September 2002).
-
K.-D. Schubert, E. C. McCain, H. Pape, K. Rebmann, P. M. West, and R. Winkelmann, “Accelerating System Integration by Enhancing Hardware, Firmware, and Co-Simulation,” IBM J. Res. & Dev. 48, No. 3/4, 569–581 (May/July 2004, this issue).
|
 |
|
 |
|