Introduction
One of the greatest problems surrounding large submicron logic
design projects today is the need to begin detailed physical design of
various components while the system-level function is still being
developed. This is particularly apparent in large array designs where
early floorplanning, layout, and wiring analysis may cause several
iterations of the array design while the functional designers attempt
to simulate the interaction of the array controller with the rest of
the system. A common method for handling this situation is to build a
simulation model comprising the actual control logic coupled to an
array macro. As the design matures, the array macro is updated to
describe the array behavior with greater accuracy. In today's
environment, time-to-market schedules do not include sufficient time to
update and maintain macros for all components that require early
detailed physical design.
Another problem facing logic designers of large ASICs surrounds
verification of nonmainline functions such as clocks and scan rings,
where the behavior tends to be abstracted or completely omitted from
the register transfer language (RTL) description. This is especially
prevalent in synthesized designs, where it is more desirable
to allow the synthesis and post-physical-design tools to
perform clock-balancing and scan-ring optimization. During the
development of the ES/9000* processor family, these portions of
the physical design were verified using specialized tools which
performed connection and electrical checks, but never verified their
operation during system-level functions.
One common approach to solving these verification problems is the use
of a circuit simulator to functionally verify the operation of a
physical design. This approach has limitations, such as size and speed,
which render it impractical in large S/390* systems comprising millions
of gates. At the same time, the problem cannot be ignored, since
today's technology advances allow large arrays and control logic to
fit on the same ASIC. This increases the importance of finding problems
prior to releasing the design to manufacturing, since a single problem
in an array or clock circuit may render the system useless or
nonfunctional in a hardware test environment. The remainder of the
paper focuses on several uses of a two-cycle simulation model to verify
various functions of the S/390 Parallel Enterprise Server G4 machine.
Array verification
One of the differentiating factors in the G4 program was the close
interaction between the array and logic design teams. Historically,
arrays used in S/390 processors were treated as commodities where
high-level behavioral macros were used in simulation models. The actual
array designs were not truly verified in the system environment until
engineering hardware was exercised on the test floor. Several factors
in the G4 program rendered the array verification a critical link to
the success of the project. For example, the performance of the machine
relies heavily on the implementation of the large arrays, especially
the L1 and L2 caches. Since so much of the system function depends on
the interaction of the arrays with the surrounding logic, it was
imperative to accurately verify their function in a system environment
prior to the initial tape-out. In response to this need, a plan was
established to verify three aspects of the array design: "black
box," internal array behavior, and array built-in self-test.
"Black box" verification
As stated earlier, parallel design efforts played a key role in
the success of the G4 program. For example, logic simulation models
were built as soon as sufficient I/O information was available for the
arrays. This meant that a simplistic functional macro was essentially
substituted for several hierarchical levels of array design. As the
array design matured, changes were made which were intended to improve
the physical design while preserving the logical behavior. Once this
deviation occurred, the macro representation used in the regular
cycle-simulation model became a "black box." It thus became the
responsibility of the two-cycle model to verify these black boxes.
For example, the data buses associated with the L2 cache were logically
arranged in such a manner that the first 64 bits represented the data
and the last 8 bits represented the error checking and correction (ECC)
bits. All schematics which interfaced with the L2 cache black box
assumed this convention. However, the cache-array designers found it
beneficial to scramble the bits in order to optimize timing and wiring.
Thus, a two-cycle model, which incorporated the actual array
schematics, was built to find mistakes in which the incoming data were
scrambled differently from the outgoing data. Since many people were
involved in the detailed implementation of the black boxes, it was not
surprising that several mistakes of this kind were found.
A second aspect of the black box which required verification was the
logical timing of the read and write operations. For example, many of
the arrays utilized an array clock which was aligned with a trigger
clock. In order to prevent write-through and LBIST problems, L1-only
latches were inserted between the array interface and the actual static
random-access memories (SRAMs). These L1-only latches were used for the
data path, the address, and the write-enable signals. For a write
operation to occur in the real design, it necessitated both an L1
(latch) clock and the array clock to propagate the data from the
interface through the L1 latches and into the SRAM. With respect to the
logic design, this translated into data being written one full cycle
after presentation to the array interface. These characteristics had to
be properly modeled in the black box macro behavior for use in the
regular single-cycle simulation model. Sometimes these characteristics
were miscommunicated or improperly coded in the high-level behavior,
thus rendering the results of the single-cycle simulation model
invalid. Once again, it was the responsibility of the two-cycle model
to verify that the arrays were operating in synergy with the
surrounding control logic.
The above approach was taken because most of the black box was still in
the conceptual design stage when the need arrived for a functional
single-cycle simulation model. Certainly, an alternate approach is
available for situations where the underlying design is understood at
the time a simulation model is required. In this case, the black box
could be defined as the actual arrays and registers, but would exclude
the support logic and any physical design changes such as data
scrambling. For example, consider a macro which consists of an SRAM,
the support logic (for decoding address bits, enabling read and write
modes, multiplexing data ports, etc.), and observation registers used
for hardware debugging. In the G4 design methodology, most of the
design was unknown at the time a functional simulation model was
required. Therefore, the entire macro was treated as a black box; a
simple array behavioral description was written to emulate the correct
logical function, but it omitted much of the detail. Once the real
design was available, a two-cycle model ensured that the underlying
detail did not break any of the logical assumptions imparted in the
black box behavior. However, if the underlying detail is known, or will
be available in the required time, the alternate approach would include
the entire design in the single-cycle model and would actually exercise
the address decoders, data port multiplexors, etc., but would black-box
the RAM and registers using a simplified single-cycle latch and array
primitive. Eventually a two-cycle model may be desired to verify the
real latch and RAM designs, but the surrounding support and debugging
logic will already have been verified. This approach provides the
advantage of maintaining only a single macro design to service both
simulation environments. The substitution of latch and array primitives
can be handled by the tools themselves. However, if the underlying
macro detail is significant, or the macro is subject to constant
iteration, the single-cycle functional simulation may experience a
productivity delay due to either reduced performance or constant churn.
Each candidate for black-boxing must be evaluated independently on the
basis of the goals, schedules, characteristics, complexity of the
design under consideration, and the maturity of the simulation
environment. Depending on these factors, one approach may be more
desirable than the other.
Internal array behavioral verification
Once the array interface issues (such as data scrambling and
logical timing) were verified, emphasis was placed on qualifying the
behavioral representation of the internal array design. In the G4
project, each array macro was represented by an accurate VHDL
[1]
description. Unlike the high-level black box behaviors which modeled
basic read and write operations, these behaviors described all
aspects of the array design, including responses to nonmainline stimuli
such as ABIST, LBIST, scan, and device leakage (IDDQ) testing. The
smaller arrays, such as the buffers and register files, were verified
using the exhaustive array verification process discussed in a
companion paper in this issue [2].
However, the large arrays such as
the directories and caches used the following deterministic array
verification process to qualify the behaviors. Qualification of these
behaviors was deemed critical in ensuring that the simulation results
were achieved against accurate behavioral representations of the array
circuit designs.
The first step in the deterministic array verification (DAV) consisted
of creating a series of test vectors for the internal circuit simulator
(Parch) in order to exercise the physical design of the arrays. This
step was performed by the array designers using test vectors whose
outcome was known or predictable. This step was iterated until the
array designers felt they had enough test vectors to satisfy them that
the actual array circuitry was performing properly.
The next step necessitated development of a special process which takes
Parch test patterns and converts them to simulation test cases using an
internal simulation application program interface called SIMAPI. These
SIMAPI test cases could be used to exercise an independent two-cycle
model constructed from the detailed array behavior. Since the Parch
test patterns contained both the input stimulus and the output
responses of the array I/O, they could produce self-checking SIMAPI
test cases by using the output responses as expected
results. A third step consisted of a derivative of the two-cycle
simulation model build process in which pieces of the process were
extracted and customized for building automated stand-alone array
models. All three steps were integrated into the DAV process, which
also included several data management techniques to ensure
synchronization of the input Parch test patterns and array behavior
with the generated array two-cycle model and SIMAPI simulation test
cases.
The deterministic array verification process proved to be very
valuable in locating inaccuracies in the array behaviors. Some examples
of the kinds of problems encountered include the following:
- Array behavior when multiple late-select lines (which are normally
orthogonal) were activated simultaneously.
- Array behavior when normally orthogonal operational modes were
activated simultaneously. An example of this would be pulsing the scan
clocks while ABIST was active.
- Array behavior during an unusual or illegal clock or control
sequence.
Although this technique does not guarantee that every conceivable
operation works correctly, careful generation of Parch test patterns
does result in thorough validation. Furthermore, this technique
provides the critical verification link between the physical design and
a behavioral description capable of participating in high-speed cycle
simulation. By centering the system verification strategy around cycle
simulation, the dependency on slower circuit and event simulators is
reduced, and more sophisticated system-level functions can be
exercised.
Array built-in self-test (ABIST)
Once the behavioral descriptions of the arrays are qualified
either through exhaustive or deterministic array verification, complex
functions such as array built-in self-test (ABIST) can be simulated.
Using a combination of the two-cycle model in conjunction with powerful
simulation engines such as ZFS (the internal cycle simulator), the G4
project was able to simulate entire ABIST sequences on all of the large
arrays in the system. Some arrays were exercised using a suite of ABIST
programs, each averaging several thousand cycles, while other arrays
required one or two programs which ran several hundred thousand cycles.
This approach not only enabled verification of the ABIST logic and the
arrays, but the simulations concluded that the clock logic was working
properly, multiple copies of the same array macros ran identically, and
all interconnections were properly wired.
Perhaps one of the most interesting uses of the ABIST simulation was in
the area of multiple-input shift-register (MISR) signature predictions
for those arrays which were included in an early-release test chip. By
the time the array behaviors and two-cycle model were validated, the
arrays on the test chip had been thoroughly examined in the laboratory.
Sufficient ABIST exercises had been run in the laboratory to produce
what were believed to be "golden" MISR signatures. These same ABIST
programs were injected into the two-cycle model to ensure that the
same MISR signatures could be obtained through simulation. This
exercise served as an ABIST certification process for the two-cycle
model which proved beneficial in two ways. The primary benefit came
when the design was modified in a way which changed the MISR
signatures. The two-cycle model was used to predict the new
signatures so that manufacturing would know, upon producing the first
wafer of the new tape-out, whether the arrays were defective. A
secondary benefit occurred in the latter stages of the project, when
changes were made to the array design which were not intended to change
the MISR signatures. Once again, the two-cycle model was used to
immediately confirm that the expected MISR signatures were still the
"golden" signatures.
Scan-ring simulation
Unlike its predecessors, the G4 machine was heavily dependent upon
LSSD scanning for many aspects of power-on, system reset, and hardware
initialization. Therefore, it was critical to find a means of verifying
the thousands of registers linked on the scan chain. The two-cycle
model enabled new types of verification tests to be developed to
certify the scan operation at several levels of the design.
Although it is possible for a single-cycle simulation model, using
simple latch models, to test the scan connections, the two-cycle
model affords one the opportunity to simulate an actual scan
operation interacting with the real system clocks. This level of detail
requires an accurate multiclock latch model which can accept all of the
necessary clock connections and mimic the L1-to-L2 transitions during
the proper clock phases. Opportunities exist in this environment to
detect nonscannable pieces of the design due to errors in the clock
connections or mistakes in the clock-sequencing logic. Since it is
still beyond the practical limits of cycle simulators to emulate all of
the scanning necessary to power-on the entire machine, the problem was
attacked in a piecewise fashion.
First, the scan chain on each chip was simulated to ensure that every
shift-register latch (SRL) was properly connected. For both the
processor and L2 chips, the architectural verification program (AVP) or
random test-case simulation environment made possible a clever approach
to verifying the scan operation. The chip would run several thousand
cycles of normal system operation, and at a random point simulation
would pause. The system mode registers would be saved, and the chip
would be placed into scan mode. The chip's scan clocks would be pulsed
once for each register on the chip, with the chip scan-out pin wrapped
back to the scan-in pin. In effect, the entire scan ring was rotated
until data in a particular register propagated through every other
register and back to their starting point. Once completed, the chip
would be restored to system mode and the system clocks would resume. As
long as the scan rings were connected properly, the random or AVP
test-case simulation would continue flawlessly, with the scan operation
having no impact. In order to ensure that the chip was really scanning,
the scan-out pin was monitored for a random data pattern. In addition,
the test was also run using an incorrect number of scan-clock pulses to
ensure that the random simulation failed.
Upon reaching system simulation, a final scan-ring check was made to
certify the interconnections among all of the chips, as well as proper
operation of the clock chip. This test usually consisted of loading a
known data pattern into a predetermined position in the scan chain.
After instructing the clock chip to perform the required number of
scan-clock pulses, the data stream was monitored for the expected
pattern. A combination of the exhaustive scan-ring test at the chip
level, coupled with the certification of the clock operation and scan
connections at the system level, provided the necessary confidence
that the hardware could be initialized via scanning.
Logic built-in self-test (LBIST)
Although the concept of logic built-in self-test (LBIST) has been
around for many S/390 generations, none of the prior verification
environments afforded the opportunity to test the logic design in a
system configuration prior to tape-out. Not only did the two-cycle
model permit the LBIST logic to be exercised to the point of generating
a full-system signature, but it assisted greatly in ensuring that the
clock control logic could sequence the processor and L2 chips through
an LBIST operation.
Another application of the LBIST verification was to use the two-cycle
model to cross-check the test-pattern generation model. This proved to
be very beneficial, since many pieces of the test-pattern generation
methodology were developed during the G4 project. With the rising costs
of processing test data on wafers at the foundries, efforts to minimize
the generation of erroneous test data translated to real savings in
development expense. This was achieved by generating LBIST signatures
on the two-cycle model in a system environment, and comparing them with
similarly generated signatures on the test-pattern generation model.
Initially, a goal of attaining ten matching signatures was established.
As a result of this endeavor, errors were discovered in the test
pattern generation tools, as well as in the macros used to represent
nonstandard components such as arrays, and in the custom latches in the
processor. Upon rectifying these modeling discrepancies, an environment
was created to permit golden LBIST MISR predictions for the G4
chip set.
Rounding out the LBIST verification was another type of test known as
an ac-skewed load test, in which the L1 and L2 portions of a
latch are loaded with orthogonal values. The trigger clock is applied
first, and is followed on the next cycle by the latch clock. This type
of test is normally used with real hardware to ensure that the L2 can
perform the required transition during the C2 cycle and can physically
deliver the new state to the next L1 in the scan ring on the following
C1 cycle. Since the two-cycle model ignores physical timing
constraints, it plays no part in verifying the ac functionality of
the machine. However, it proved valuable in detecting modeling problems
with the latches and arrays. These escaped functional simulation,
because functional simulation always starts with matching data in the
L1 and L2 portions of a latch. This exercise further assisted in
instilling the proper confidence level in the behavioral representation
of many of the fundamental design components.
Clock verification
Errors in the design of clock logic often result in hardware
engineering changes, yet prior S/390 machines neglected to simulate the
gate-level design of the clock logic at the system level. Although it
is true that certain components of the clock circuitry, such as
phase-locked loops, cannot be simulated in a cycle simulator, much of
the design in the complex S/390 clock environment lends itself well to
two-cycle simulation.
In the G4 machine, a multitude of test plans were developed to exercise
different facets of the clock logic. The design under test covered the
clock chip in the system as well as the on-product clock-generation
(OPCG) logic contained in the processor and L2 chips. The following are
examples of the types of tests run:
- Cycling the clock chip through the various modes such as LBIST,
ABIST, and SOCE (Stop On Count or Error), and ensuring that the proper
clock sequences were generated. This test uncovered a design problem in
the clock chip in which the resulting number of clock pulses generated
for a SOCE command were incorrect.
- The serial interface between the clock chip and the processor was
monitored for proper operation.
- Various types of clock stop/start sequences were run to ensure that
all of the chips in the system stopped and started in tandem. One
of these tests uncovered a problem in which the arrays could not be
written using chip single-cycle mode. Fortunately the arrays worked in
system single-cycle mode, which allowed the specialized millicode to be
rewritten without the need for a hardware engineering change.
- Although the phase-locked loop itself could not be exercised, all of
the logic required to scan-initialize it to the various run-time
modes was verified.
The two-cycle model also proved beneficial in isolating a design
problem first discovered on the engineering test floor. The model
proved to be accurate enough to uncover a problem in an array design in
which a certain start/stop sequence of the clocks resulted in an extra
write operation taking place in the array. This eventually led to a new
type of clock-verification test for future tape-outs.
Design data verification
An integral part of the G4 verification plan was the use of
simulation to verify as much of the firmware design data as possible.
This was especially important because development of much of the code
was isolated from the hardware design. In addition, pieces of the
engineering hardware test plan depended heavily on the ability to load
specialized millicode into the caches via the design data. Therefore,
several types of special-purpose two-cycle models were built to remove
as many design data errors as possible prior to receiving
engineering test hardware.
One model was established solely to test the specialized millicode
which was loaded into the L2 cache. Although this code was locally
developed, it had to interface with S/390-level initial millicode load
(IML) code. Since this test was designed to run on a nonstandard
hardware configuration, it was imperative to ensure that the existing
S/390 code could support this type of engineering debug exercise. The
next test simulated the array characterization data, which describe the
manner in which the array control logic must be scanned in order to
perform atomic read and write operations on the arrays. The process for
creating these data was prone to mistakes, so the two-cycle model
served as a qualification tool for the array characterization data.
Several problems were encountered in which the characterization data
were incorrectly initializing the array control logic.
Perhaps the most impressive use of the two-cycle model at a system
level was for verification of the service element software. In this
environment, the actual service element code was attached to the
two-cycle model through a special interface called the hypervisor. The
role of the hypervisor was to intercept the signals between the service
element and hardware interface and to replace them with the
corresponding simulation application program interface (SIMAPI)
commands to load and read the appropriate registers in the model. Use
of the two-cycle model in this fashion enables complex S/390 software
to be debugged and tested to gain preliminary confidence prior to
enlisting expensive test-floor machine time to run the code.
Correlation with single-cycle simulation models
One of the most powerful weapons in the G4 verification
methodology is the extensive use of cycle simulation at various levels
of the design ranging from the functional units comprising the
processor all the way up to symmetrical multiprocessor (SMP) systems
with multiple processors. Although the most accurate form of simulation
would be to use a two-cycle model exclusively, this is simply
impractical. To begin with, the model requires the physical design to
reach a certain state of completeness, which is counterproductive to
rapidly advancing the logic design. Second, a two-cycle model runs
twice as slowly as a single-cycle model, and the complexity of the G4
simulation test plan requires the faster single-cycle model. In
addition, the models focus primarily on mainline system functions. This
translates into models utilizing numerous black boxes which sacrifice
slower gate-level accuracy for faster high-level descriptions. These
high-level macros are often written early in the design cycle, while
the details of the black boxes are still being implemented. In this
type of environment, the risk exists that a high-level description was
based on an inaccurate assumption, or that a design change later in the
cycle was never propagated back into the high-level macro.
To minimize this risk, the two-cycle model was used to cross-check the
single-cycle model. In the case of the L2, the random simulation
environment was enhanced such that the same code could exercise either
type of model. This permitted the simulation team to select a seed from
a single-cycle simulation run and exercise it on both models. In
addition, several functional simulation test cases would be run against
both models to ensure that the physical design exhibited the correct
functional behavior. Performing both of these activities prior to
tape-out helped instill confidence in the congruence between the two
simulation models. This, in turn, assisted in validating the millions
of single-cycle simulation results. In the case of the processor,
correlation with the single-cycle model was aided by an environment
centered around AVPs. Thus, it was simply a matter of running the same
AVPs on both models and ensuring that the results were identical.
Results and conclusions
Perhaps the greatest testimonial bestowed on the two-cycle
simulation effort is the integral role it played in ensuring that the
circuit design functioned in a manner equivalent to that of the
corresponding simulation models. Evidence of this became apparent with
the first hardware release, which powered on in an unprecedented
fashion by allowing the test team to exercise all supported mainline
function. The contribution associated with two-cycle simulation is more
apparent when contrasted with the test-floor experience on past S/390
machines. For example, in an earlier project a coding problem in a
checking tool permitted a number of chips to be released with
nonfunctional scan rings. Although the functional logic was fine, this
error required an emergency hardware release to allow engineering test
to continue. In another escape, the scanning function was inhibited by
incorrect implementation of tie-ups and tie-downs on some of the
physical books. During the G4 project, these types of problems were
detectable with two-cycle simulation.
This is not to say that two-cycle simulation is a guarantee to a
successful power-on. As with any simulation endeavor, the results are
only as good as the model and the type of test vectors exercised. In
the initial G4 hardware, a problem was encountered on the test floor
with respect to a window condition involving the scanning operation.
The two-cycle simulation model verified the scanning operation using
only a single test case in which the normal system clocks were always
stopped during the trigger phase. However, a design problem
was found in some of the arrays such that interrupting the system
clocks to perform scanning during the latch phase could
result in a one-cycle window where the output data came from the wrong
address. The problem was accurately reproduced and debugged in a
two-cycle simulation environment, and the scan-verification test was
enhanced to prevent this type of error on subsequent releases.
Many advances have been made in recent history with respect to
large-scale simulation. Some, such as event simulators, help close the
accuracy gap by allowing the designer to simulate a behavioral
representation containing logical and physical design characteristics.
Other advances, such as cycle simulation, focus on speed and
performance by assuming that certain physical constraints are met.
Finally, advances in the area of cosimulation permit design components
accustomed to event simulation to interact with components that benefit
from cycle simulation. However, two-cycle simulation provides a new
dimension to the verification world by affording a method to exploit
the performance of regular single-cycle simulation and augment it with
system-level operations governed by the intricacies of the
physical design.
Acknowledgments
None of the disclosed advances in simulation verification would
have been possible without the contribution of many individuals. The
author would especially like to acknowledge both the abundant
contributions of Rick Seigler and Daniel Beece to the development of
the two-cycle simulation model and their assistance in developing many
of these verification techniques. The following people also deserve
mention for their outstanding contributions in the areas of two-cycle
verification as well as for providing valuable information for this
paper: Bruce Wile, William Huott, Timothy McNamara, Timothy Koprowski,
Steven Licker, Edward Kaminski, Jr., Thomas Gilbert, Ken Shepard,
Thomas Foote, Bryan Robbins, Tim Charest, William Dachtera, Cara
Hanson, and Michael Mullen. Finally, a special thanks to Bing-Lun Chu
for his thorough review and valuable contributions to this paper.
*Trademark or registered trademark of International Business
Machines Corporation.
References
Received December 4, 1996; accepted for publication May 5, 1997
|